KPDCL Power Shutdown Schedule 2026: Areas and Timings for August 29–31
Kashmir Power Distribution Corporation Limited (KPDCL) has announced scheduled power shutdowns in several areas of Srinagar, Budgam and Shopian on August 29, 30 and 31, 2026. The shutdowns have been planned to facilitate maintenance work on various 33 kV power lines.
KPDCL Power Shutdown Schedule for August 29
| Area | Date | Timing | Line |
|---|---|---|---|
| BK Pora, Khanda, Chattergam, Kenihama, Summerbugh, Railway Station Shalina, Wagoora, Wadpora, Aribagh, Checkpora and adjoining areas | Aug 29 | 8 AM–2 PM | 33 kV Pampore-BK Pora |
| Kondabal, Hassanabad, Hazaribagh, JLNM Hospital, Jogilanker, Maqdoom Sahib, Miskeen Bagh, Rozbal and adjoining areas | Aug 29 | 8 AM–1 PM | 33 kV Khanyar-Rainawari |
KPDCL Power Shutdown on August 30
| Area | Timing | Line |
|---|---|---|
| Industrial Estate, BAMK, Raja Colony, Alamgari Bazar, Lal Bazar, Hawal and adjoining areas | 8 AM–1 PM | 33 kV GIS-BAMK |
| Gagren, Memender, Sharatpora, Khudpora, Habdipora, Town Shopian and adjoining areas | 9 AM–2 PM | 33 kV Kanipora-Batapora-Gagren |
KPDCL Power Shutdown on August 31
Ompora, SIDCO, Housing Colony, Railway Station Budgam, NIFT and adjoining areas will face a scheduled power shutdown from 8 AM to 2 PM because of maintenance work on the 33 kV Budgam-SIDCO line.
Follow Us On whatapp
Why Has KPDCL Scheduled the Power Shutdowns?
According to the information provided by KPDCL, the shutdowns are being carried out to facilitate maintenance-related work on the respective 33 kV power lines.
KPDCL Power Shutdown: Important Dates
- August 29, 2026: Several areas of Srinagar and adjoining areas
- August 30, 2026: Areas in Srinagar and Shopian
- August 31, 2026: Areas in Budgam
Important Note
Residents and businesses in the affected areas should take note of the scheduled timings and make necessary arrangements before the shutdown begins.
