KPDCL Announces Scheduled Power Shutdown in Ganderbal from November 3 to 8
SRINAGAR: The Kashmir Power Distribution Corporation Limited (KPDCL) has announced a scheduled power shutdown across several areas of Ganderbal district between November 3 and November 8, 2025, to carry out essential maintenance and repair work on key 33 KV lines.
Follow our WhatsApp Channel for instant updates — Join Now
According to the power supply from the 33 KV Badampora–Wangipora and 33 KV Badampora–Army Hakbara lines will remain affected on November 3 and 6. This will impact receiving stations at Batwina, Wangipora, Nowgam, Hakbara, Hajin, and Madwan Army, resulting in disruption of electricity to areas including Batwina, Nowgam, Wangipora, Zazna, Ahan, Waskura, Kharbugh, Sumbal, Nesbal, Hajin, Preng, Madwan, Banyari, Hakbara, Chandergeer, and nearby villages from 9:30 AM to 3:30 PM.
Stay updated on all latest developments from the Valley here: Kashmir News Today
Similarly, the 33 KV Lar–Tulmulla line will undergo maintenance on November 4 and 8, leading to shutdowns at the Lar and Tulmulla receiving stations. Power supply to Lar, Waliwar, Watlar, Repora, Tulmulla, Dangerpora, Larsun, and adjoining areas will remain affected between 9:30 AM and 3:30 PM on these dates.
J&K Govt Suspends Salaries of 18 BDOs Over Poor MGNREGA e-KYC Performance
KPDCL has urged residents to make necessary arrangements in advance and expressed regret for the inconvenience caused during this scheduled maintenance period, emphasizing that the work is part of ongoing efforts to improve electricity reliability and reduce unplanned outages in the district.
Tags: KPDCL Ganderbal power shutdown, Ganderbal electricity schedule, KPDCL maintenance 2025, Kashmir power cut, Kashmir electricity news, Ganderbal outage news
