Srinagar, Ganderbal to Face Scheduled Power Shutdowns on December 13, 16 & 20: KPDCL
SRINAGAR: The Kashmir Power Distribution Corporation Limited (KPDCL) has issued a fresh schedule of planned power shutdowns that will impact several areas of Srinagar and Ganderbal on December 13, with additional outages notified for later in the month.
For more local updates, check Srinagar News — https://www.timesofkashmir.in/srinagar-news/
Follow our WhatsApp Channel for instant updates — Join Now
As per the Chief Engineer (Distribution), the 33 KV Arampora–MES line will remain shut on December 13, from 10:00 a.m. to 3:30 p.m., affecting Zangli Garrison and nearby areas.
Winter Vacation Schedule 2025–26 Announced for Kashmir & Winter Zones of Jammu | Full Details
Jammu Kashmir: Govt Launches Inquiry Into Alleged Sale of Adulterated Eggs in Local Markets
Minimum Temperatures Recorded Today in jk
SKIMS Soura Releases Provisional Selection List for MRTTC Course 2025
Jk District wise Minimum Temperatures Recorded Today
Similarly, the 33 KV Alasteng–Nagbal line will remain shut on December 13, 16 and 20 during the same hours. This shutdown will impact Shuhama, Bakoora, Nagbal, Malshaibagh, Saloora, Gadoora, Fatehpora, Shairpathri and adjoining localities.
The 33 KV Alasteng–Zakura line is also scheduled for shutdown on December 13, from 10:00 a.m. to 3:30 p.m., affecting Pandach, Pathan Colony, Gulabagh, Mir Mohalla, Umarhair, Nowbugh, Ahmad Nagar, 90 ft Road, Khalmullah and surrounding areas.
KPDCL stated that these shutdowns are mandatory to facilitate maintenance and ensure stable power supply during winter.
Tags: KPDCL Power Shutdown, Srinagar Power Cut, Ganderbal Electricity Update, Kashmir Electricity Schedule, J&K Power News
